40001百老汇官方网 - 40001百老汇官网在线主页

Korea MEC
Date:2024/1/18 15:17:49 Hits:1334
Before improvement: many kinds of materials; Using the traditional material point method, the degree of automation is low; Low efficiency of personnel counting materials.
After improvement: automatic loading and unloading, automatic quantity label update after the material is OK; Point efficiency increased by 70%; Optimized 20% of manpower.
【网站地图】【sitemap】